Road Projects | 2022

Share Road Projects | 2022 on Facebook Share Road Projects | 2022 on Twitter Share Road Projects | 2022 on Linkedin Email Road Projects | 2022 link

Consultation has concluded



The following road improvements are planned for 2022


Hurl Street Road Restoration | Budget: $165,000 (project carried over from 2021)

Description: Replace the entire road base and pavement of Hurl Street from 16th Avenue North to approximately 20 metres East of 19th Avenue North. Hurl Street will be completed once there is no longer frost, and it will be paved once the concrete curb is replaced.

Started: 3rd quarter 2021 | Estimated completion: 2nd quarter 2022. (timeline will depend on paving contractors work schedule)


Chip Sealing

Description: Sites to be determined.

Estimated start: 3rd or 4th quarter 2022


Do you have any questions? No problem! Just reach out below and we will get back to your shortly.



The following road improvements are planned for 2022


Hurl Street Road Restoration | Budget: $165,000 (project carried over from 2021)

Description: Replace the entire road base and pavement of Hurl Street from 16th Avenue North to approximately 20 metres East of 19th Avenue North. Hurl Street will be completed once there is no longer frost, and it will be paved once the concrete curb is replaced.

Started: 3rd quarter 2021 | Estimated completion: 2nd quarter 2022. (timeline will depend on paving contractors work schedule)


Chip Sealing

Description: Sites to be determined.

Estimated start: 3rd or 4th quarter 2022


Do you have any questions? No problem! Just reach out below and we will get back to your shortly.

Consultation has concluded

Do you have questions regarding this year's road projects? Just reach out here! 

Enter your question and our staff will reply shortly.

  • Share Would the counsellors and mayor consider adding raised crosswalks on 10 ave North to slow traffic down to the posted speed limit of 30km. Thank you on Facebook Share Would the counsellors and mayor consider adding raised crosswalks on 10 ave North to slow traffic down to the posted speed limit of 30km. Thank you on Twitter Share Would the counsellors and mayor consider adding raised crosswalks on 10 ave North to slow traffic down to the posted speed limit of 30km. Thank you on Linkedin Email Would the counsellors and mayor consider adding raised crosswalks on 10 ave North to slow traffic down to the posted speed limit of 30km. Thank you link

    Would the counsellors and mayor consider adding raised crosswalks on 10 ave North to slow traffic down to the posted speed limit of 30km. Thank you

    Flower asked almost 3 years ago

    Thanks for your question. Our Multi-Modal Transportation Plan (that is currently in the works) will identify areas of the community that require road safety improvements. The report will be finalized this summer, and following its adoption by Council, decisions will then be made on what the top priorities will be. If you would like to stay in the loop on the Multi-Modal Transportation Plan, please visit https://letstalk.creston.ca/multimodaltransportation-plan and sign-up for projects updates.

  • Share Are there any plans to have Sunset Blvd repaired? This small section of road is full of holes, cracks, and bumps. It is already a very tight road to begin with. Sunset Blvd is a major Erickson to Creston connector, especially for farming equipment. on Facebook Share Are there any plans to have Sunset Blvd repaired? This small section of road is full of holes, cracks, and bumps. It is already a very tight road to begin with. Sunset Blvd is a major Erickson to Creston connector, especially for farming equipment. on Twitter Share Are there any plans to have Sunset Blvd repaired? This small section of road is full of holes, cracks, and bumps. It is already a very tight road to begin with. Sunset Blvd is a major Erickson to Creston connector, especially for farming equipment. on Linkedin Email Are there any plans to have Sunset Blvd repaired? This small section of road is full of holes, cracks, and bumps. It is already a very tight road to begin with. Sunset Blvd is a major Erickson to Creston connector, especially for farming equipment. link

    Are there any plans to have Sunset Blvd repaired? This small section of road is full of holes, cracks, and bumps. It is already a very tight road to begin with. Sunset Blvd is a major Erickson to Creston connector, especially for farming equipment.

    Viola asked almost 3 years ago

    Sunset Boulevard is classified as a residential local road. Although it is not in our roads master plan to reconstruct at this time, it has been brought forward to be reviewed within this year's Multi Modal Transportation Plan. There are plans to try and chip seal this road later in the year (2022).

  • Share Just curious as to how and why Hurl street was chosen to be paved when it is a street mainly used by residents of Hurl, and not in nearly as bad as Sunset Blvd, Railway Blvd below the tracks, 10th Ave N, 12th and Murdoch (just to name a few), are in terrible shape needing repair. This does not make any sense. Murdoch St and 12th Ave N are used as a shortcut from 16th Ave N and are extremely busy streets now with all the new subdivisions. Also I feel a couple of roundabouts would be very helpful at Tim Hortons and A&W. on Facebook Share Just curious as to how and why Hurl street was chosen to be paved when it is a street mainly used by residents of Hurl, and not in nearly as bad as Sunset Blvd, Railway Blvd below the tracks, 10th Ave N, 12th and Murdoch (just to name a few), are in terrible shape needing repair. This does not make any sense. Murdoch St and 12th Ave N are used as a shortcut from 16th Ave N and are extremely busy streets now with all the new subdivisions. Also I feel a couple of roundabouts would be very helpful at Tim Hortons and A&W. on Twitter Share Just curious as to how and why Hurl street was chosen to be paved when it is a street mainly used by residents of Hurl, and not in nearly as bad as Sunset Blvd, Railway Blvd below the tracks, 10th Ave N, 12th and Murdoch (just to name a few), are in terrible shape needing repair. This does not make any sense. Murdoch St and 12th Ave N are used as a shortcut from 16th Ave N and are extremely busy streets now with all the new subdivisions. Also I feel a couple of roundabouts would be very helpful at Tim Hortons and A&W. on Linkedin Email Just curious as to how and why Hurl street was chosen to be paved when it is a street mainly used by residents of Hurl, and not in nearly as bad as Sunset Blvd, Railway Blvd below the tracks, 10th Ave N, 12th and Murdoch (just to name a few), are in terrible shape needing repair. This does not make any sense. Murdoch St and 12th Ave N are used as a shortcut from 16th Ave N and are extremely busy streets now with all the new subdivisions. Also I feel a couple of roundabouts would be very helpful at Tim Hortons and A&W. link

    Just curious as to how and why Hurl street was chosen to be paved when it is a street mainly used by residents of Hurl, and not in nearly as bad as Sunset Blvd, Railway Blvd below the tracks, 10th Ave N, 12th and Murdoch (just to name a few), are in terrible shape needing repair. This does not make any sense. Murdoch St and 12th Ave N are used as a shortcut from 16th Ave N and are extremely busy streets now with all the new subdivisions. Also I feel a couple of roundabouts would be very helpful at Tim Hortons and A&W.

    Storm asked over 3 years ago

    Great question! The water distribution main and some lateral service lines are due for replacement this year on Hurl Street. A large portion of the road surface will be removed to complete this work, making it cost effective for paving. If you would like any further details on this, please do not hesitate to reach out to our Director of Infrastructure Services - Ferd Schmidt at Town Hall 250-428-2214.

  • Share Are there plans to restore the asphalt at the 4 way stop at Railway and Canyon? on Facebook Share Are there plans to restore the asphalt at the 4 way stop at Railway and Canyon? on Twitter Share Are there plans to restore the asphalt at the 4 way stop at Railway and Canyon? on Linkedin Email Are there plans to restore the asphalt at the 4 way stop at Railway and Canyon? link

    Are there plans to restore the asphalt at the 4 way stop at Railway and Canyon?

    WoodyW. asked over 3 years ago

    Thanks for your question. Infrastructure Services is budgeting to chip seal this intersection and Railway Boulevard next year.

  • Share What about pine st from 16 Ave to 20 th on Facebook Share What about pine st from 16 Ave to 20 th on Twitter Share What about pine st from 16 Ave to 20 th on Linkedin Email What about pine st from 16 Ave to 20 th link

    What about pine st from 16 Ave to 20 th

    Tim Lengyell asked over 3 years ago

    This section of Pine Street would require underground infrastructure replacement (water, sanitary and storm main replacement), also curb/gutter installation, and .5 of a metre of granular base replacement. The budgetary cost for this is not within the five-year roads capital works plan. We are hoping to chip seal this stretch of road in the next three years.

  • Share hello, just wondering when lower wynndel rd is going to get redone? on Facebook Share hello, just wondering when lower wynndel rd is going to get redone? on Twitter Share hello, just wondering when lower wynndel rd is going to get redone? on Linkedin Email hello, just wondering when lower wynndel rd is going to get redone? link

    hello, just wondering when lower wynndel rd is going to get redone?

    raymonater asked over 3 years ago

    This road is not within Town Limits - it is within RDCK Area C and is the responsibility of the Ministry of Transportation. If you would like to contact the Ministry of Transportation in Nelson, below is their contact info:

    West Kootenay District

    310 Ward Street, 4th floor
    Nelson, BC V1L 5S4
    Telephone: 250 354-6400
    Fax: 250 354-6547